Northwest I-75 Corridor

Contractor
The Walsh Group, Archer Western
Project Dates
May-September 2018
Project Location
Northwest Atlanta

From the project is the largest transportation infrastructure project in the history of the Georgia Department of Transportation (GDOT). The design-build-finance project will complete 29.7 miles of reversible managed toll lanes along I-75 and I-575 in Cobb and Cherokee Counties. The proposed improvements extend existing high-occupancy vehicle lanes northward along I-75 and I-575. The project will include 1 million CY of unclassified excavation, 140,000 linear feet of drainage, 315,000 SY of concrete paving, 280,000 linear feet of concrete barrier, 1.4 million SF of sound wall, 1 million SF of bridge deck (39 bridges) and 900,000 SF of retaining wall. Pressure washing of the 900,000 SF sidewalls.